Width
Varies between 4 and 7 metres. Bishopstone Group Parish Council recorded that it is “not wide enough in many places for 2 HGVs to pass”.
Evidence
None of this is our measurement. It is the bypass’s own survey programme, the council’s commissioned reviews, and its officers’ recorded decisions. And note the dates: these are the newest figures the council has published, and the newest of them is nearly a decade old.
The bypass’s own survey programme placed ATC Site 1 — the first site — on the C1098 river crossing itself. The drawing labels the road only as “Un-named Road”.
| Measure | Direction 1 | Direction 2 |
|---|---|---|
| 24-hour flow | 1,138 | 1,152 |
| AM period, 07:00–10:00 | 208 | 443 |
| PM period, 16:00–19:00 | 384 | 241 |
| Two-way daily total | ~2,290 vehicles, approximately 1% HGV | |
The hourly profile is strongly tidal — a pronounced peak in one direction around 08:00, mirrored by the other around 17:00. That is the signature of commuter through-traffic using the crossing, not local movement.
This matters twice over. It is the official pre-scheme baseline any monitoring trigger can be anchored to. And it means the western crossing was inside the scheme’s own evidence base from 2016 — while being absent from the assessment that decided the scheme’s effects.
These counts are from November 2016. Ten years on, they are a floor, not a picture of today: traffic on Herefordshire’s roads has grown since, and the probability is that flows over the bridge are now higher. The council re-surveyed traffic in 2025 to build the updated model behind its Full Business Case — so current figures for these roads exist. The council holds that data and has not published it. Disclosure of the 2025 study is one of our five asks.
In 2017 the council ran automatic number plate recognition surveys at both ends of the road, measuring vehicles that passed straight through with no intermediate stop — pure cut-through traffic.
| Survey date | Through movements, two-way | Of which over 7.5 t |
|---|---|---|
| 9 November 2017 | 64 | ~21 |
| 6 December 2017 | 39 | ~19 |
Because the method is defined and repeatable, these counts are a ready-made trigger metric. Re-run the same survey after opening, and the comparison is against the council’s own numbers, by the council’s own method.
From the council-commissioned review of January 2018, covering the 4.3 km national-speed-limit section between Bridge Sollers and Madley:
Varies between 4 and 7 metres. Bishopstone Group Parish Council recorded that it is “not wide enough in many places for 2 HGVs to pass”.
Characterised by a number of noticeably sharp bends which, with the narrow carriageway, act as traffic calming.
No footways except on the bridge section. No street lighting. Passing places “few and far between” — one formal, about 20 metres.
Direct access to 21 dwellings, 25 fields, nine farming businesses, six private lanes and a church. Three bridleways and seven footpaths.
Signed “Unsuitable for HGVs” — in 2018 at the southern B4352 end only, with no such sign at the A438 end, the direction crossing traffic arrives from.
85th-percentile speeds of 33.5–37.7 mph at two locations. The review concluded speeds are self-limited by geometry.
Six personal-injury collisions were recorded in the five years from June 2012 to May 2017. Three were on the C1098 itself — loss of control at a bend into an oncoming vehicle, rear shunts, and a collision with an agricultural vehicle in which road layout was a stated contributory factor. Two more were at the A438 junction, caused by vehicles waiting to turn to or from the C1098.
Bishopstone Group Parish Council additionally reported a serious collision at the Bridge Sollers crossroads in January 2018, requiring two air ambulances. That post-dates the validated dataset above.
This is not a new objection. Madley Parish Council asked for a speed limit between Bridge Sollers and Madley in 2012. The C1098 entered the council’s prioritised traffic regulation order waiting list. The ward member for Stoney Street recorded that residents of Madley and Bridge Sollers
almost to a person want a speed limit and a weight limit on the road Ward member consultation response, 2018
— and that the apparent inability of the police to enforce limits was one of the main reasons for refusal. Madley Parish Council’s own response warned that
serious consideration should be given by the county planners to new planning applications which would increase the amount of commercial traffic along the Bridge Sollars Road Madley Parish Council, 2018
That is a formal warning, given in 2018, against exactly the kind of decision now being taken.
| Date | Event |
|---|---|
| 18 July 2016 | Planning permission P151314/F granted, with 21 conditions |
| November 2016 | ATC Site 1 survey on the C1098 crossing |
| Nov–Dec 2017 | ANPR through-movement surveys at both ends of the C1098 |
| Jan–May 2018 | Speed and weight restriction reviews; both refused |
| 14 March 2019 | 2018 Side Roads Order confirmed by the Secretary of State |
| July 2019 | Nominal commencement of works keeps the permission alive |
| February 2024 | AECOM review finds the 2016 evidence base substantially out of date |
| December 2025 | Cabinet resolves to make a Compulsory Purchase Order |
| August 2026 | Full Business Case published, acknowledging induced traffic on the C1098 |
| 10 September 2026 | Cabinet considers the Phase One Assessment Report |
| December 2026 | Construction programmed to start |
| around 2028 | Programmed opening |
Every claim on this site is drawn from the following documents. All are council or consultant documents obtained from the planning record, from published Cabinet papers, or by freedom of information and environmental information request.
Documents released under freedom of information or environmental information request have no public web link — printed copies will be available at the meeting on 31 August. If you believe any figure here is wrong, please tell us. Our interest is in the accuracy of the evidence base — which is exactly what we are asking of the council.